Panelized and Assembled on Site #
Your shed components are pre-built and painted at our facility, then transported to your property on a flatbed truck or trailer. Our crew arrives, levels the base, and completes all final assembly on-site.
What to Expect on Installation Day #
- Our crew arrives and assesses the installation site
- Concrete pavers are placed in spot
- The shed foundation is built
- Walls and roof are erected
- Doors, windows, and trim are installed, adjusted and finished
- Roof is shingled
- Final paint touch ups (weather permitting)
- The work area is cleaned up before our crew leaves
How Long Does It Take? #
Most sheds are installed within a full day. Larger builds or sites with challenging access or significant levelling requirements may take longer. We’ll give you an estimated time window when scheduling.